1. We believe the introduction of the software of flow analysis of injection molding. <br>Since there is a need to write a budget document, <br>effect that must be realized after the introduction, the goal <br>Please thinking of meeting with KuniTadashi Fukuri and Earl晨課length. <br>Mold design is getting better, reducing the size failure, <br>the number of tests of the time on the mold elevation is decreased, rising delivery time is short <br>and so on. <br>It is very good and can be represented by the amount of money. <br>Please prepare because it was meeting to 1/8. <br><br>2. draft revision of development improved provision <br>when there is a claim of clean tube 40A, <br>confirmed at the time of 4M change, in order to clarify the DR method <br>decided by the meeting When you add a 4M change to the development improvement provisions. <br>Please to complete the draft. <br>Earl晨課length and Takumikumo section chief, please make a proposal in the quality assurance department members. <br><br>3. measures implementation status confirmation of past claims. <br>1/10 of the measures of claims that occurred in the past three years in the (gold) is being implemented <br>I think I want to do on-site confirmation. <br>Until then to check the claim listing in Shinaho, please refer to the prior confirmation of the site. <br>Where that is not possible if, if there is a place which is back to the original, <br>to point out, please let implement measures to department. <br><br>4. mold of swing Chakki <br>writing a budget document in 2017, the mold of the swing Chakki<br>The processing productivity improvements we have decided to do the remodeling for the purpose. <br>Does this all completed? <br>KuniTadashi's confirmation, I will report you. <br> <br>5. development themes <br>Puragiya mold start-up schedule of the large-diameter <br>rising schedule of the core new F-type <br>please create again. <br>Not only will the next test, I'd like a schedule of up to start-up is complete. <br>Please report to 1/6. <br>Kamatani's assembly was a business trip, the schedule is important because it comes to the performance verification. <br><br>6. claims monthly report <br>Please make because it submitted to 1/6. <br><br>Thank you.
正在翻譯中..
