Vendor to confirm compliance to supply equipment as following<br> a) Seismic load is not consider, but Wind loads to be considered in the design: 1,2 kN/m2 at 25 m. Monsoon like severe rain<br>showers up to 120 mm/h (design base roofs 160 mm/h), during max. 1 hour. The wind load & pressure shall be complied to below
正在翻譯中..
![](//zhcntimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)